Building a House? Plan for Solar Before the Roof Is Poured

Eight things to sort while the house is going up: sanctioned load, a clear roof, cable route, backup wiring and the subsidy, so solar is simple afterwards.

Updated 23 September 2026

A house takes months to build and a solar system takes days to install, so there is no need to do them together. There is a lot you can do while the house is going up that makes the solar simple, and cheap, afterwards.

Most of it costs nothing at this stage. All of it is awkward once the plaster is on.

First, get a rough idea of the size

Everything else follows from this. The size of a home system in Punjab is driven by air conditioning more than anything else:

Estimated use for the same house, by how many ACs it runs

  • No AC about 2 to 2.5 kW of panels 230 units
  • One 1.5 ton AC about 3 to 3.5 kW of panels 320 units
  • Two 1.5 ton ACs about 3.5 to 4.5 kW of panels 410 units
  • Three ACs and an EV about 5.5 to 7 kW of panels 630 units
From our new-house calculator: a four-person home with a fridge, lights, fans, a TV, a washing machine and the usual kitchen, with ACs added. Summer months run well above these averages.
Show as a table
Estimated use for the same house, by how many ACs it runsUnits a month
No AC (about 2 to 2.5 kW of panels) 230 units
One 1.5 ton AC (about 3 to 3.5 kW of panels) 320 units
Two 1.5 ton ACs (about 3.5 to 4.5 kW of panels) 410 units
Three ACs and an EV (about 5.5 to 7 kW of panels) 630 units

Two ACs take the same house from about 230 units a month to about 410, and a third AC with an EV in the driveway pushes it past 630. Work through the new-house calculator with the appliances you actually plan to buy, and you will have a size range to plan around.

Eight things to do while you build

1. Ask PSPCL for enough sanctioned load

A rooftop system can be at most 100% of your sanctioned load. Apply for the new connection with the system in mind: 5 kW of load for a 5 kW system. Going back later for load enhancement is a separate application, and it has to be done before the solar one.

2. Keep the south side of the roof clear

Panels need about 100 sq ft each per kW, and they need it without shade. Put the water tanks, the stair cabin and the dish on the north side, where their shadows fall away from the panels. Winter shadows are much longer than the ones you see in June.

3. Plan the structure while the slab is designed

Panels usually sit on an elevated structure, which keeps the terrace usable underneath. Tell whoever designs the slab that it will carry one, and finish the waterproofing before anything is fixed to it.

4. Leave a conduit from the roof to the inverter

A 40 mm conduit from the terrace down to where the inverter will hang saves chasing finished walls. Put the inverter somewhere shaded and ventilated, close to the main distribution board, not in a sealed cupboard and not in the afternoon sun.

5. Put in an earthing pit for the solar

Solar needs its own earthing, plus a lightning arrester on the roof. Digging a pit costs little while the site is already dug up and a great deal once the driveway is laid.

6. Decide about backup before the wiring is done

If you want lights and fans to run through a power cut, they need to sit on their own backup board. Doing that now costs a few hundred rupees in wire. Doing it later means rewiring circuits. The hybrid calculator shows what a battery for those circuits looks like.

7. Put a water tap on the terrace

Panels need a wash every few weeks in dusty and smoky months. A tap on the roof turns that into a five-minute job. Carrying buckets upstairs is how panels end up never being cleaned.

8. Keep the connection and the paperwork in the owner’s name

The subsidy is paid to the person who owns the house and holds the electricity connection, into a bank account in the same name. Mismatched names are one of the most common reasons applications stall. The subsidy guide has the full list of documents.

What the order of events looks like

  1. Sanctioned load applied for with the solar system in mind.
  2. House finished, PSPCL connection live in the owner’s name.
  3. Application on the PM Surya Ghar portal, and PSPCL approves feasibility.
  4. Installation, which takes a few days for a home system.
  5. PSPCL fits the net meter and inspects, then the subsidy reaches your bank account.

Nothing should be installed before step 3, which is why the panels wait until the house has its own connection.

Send us the drawings

We are happy to mark up a roof plan before the slab is poured: where the panels go, where the conduit runs, where the inverter hangs. Send the drawings and a list of the appliances you plan to run, and we will tell you the size to plan for. We install in Mohali and the Tricity with our own team, and across Punjab through our dealers.

Questions we are asked

Should I install solar while the house is being built?

Usually just after. The PM Surya Ghar subsidy needs the electricity connection in the owner’s name, and PSPCL has to approve feasibility before anything goes up, so the system follows the connection. What you can do during construction is make the roof and the wiring ready for it.

How much sanctioned load should I ask PSPCL for?

Enough for the system you want, because a rooftop system can be at most 100% of your sanctioned load. If you expect a 5 kW system, apply for at least 5 kW. Raising it later means a separate load-enhancement application before the solar one.

How do I know what size I will need with no electricity bill?

Estimate it from the appliances you plan to run. The new-house calculator asks for your ACs, geysers, fridge, lights, fans and the rest, then gives your likely units and a size range. Once a few real bills arrive, the bill calculator can check it.